| Building Material Expenses |
| 1 |
Excavation |
3,105 |
Qu.Ft |
12 |
37,260 |
| 2 |
Bricks (First Quality) |
104,052 |
Nos |
19 |
1,976,988 |
| 3 |
Cement |
1,383 |
Bags |
1,480 |
2,046,840 |
| 4 |
Sand (Chenab) |
5,940 |
Qu.Ft |
60 |
356,400 |
| 5 |
Crush (Sargodha) |
2,991 |
Qu.Ft |
178 |
532,398 |
| 6 |
Roof Shuttering |
5,978 |
Sft |
60 |
358,680 |
| 7 |
Steel (60 Grade) |
6,180 |
KG |
270 |
1,668,600 |
| 8 |
PCC - Crush - Coarse Base |
2,991 |
Qu.Ft |
110 |
329,010 |
| 9 |
Door Frames (Chughat) |
16 |
Nos |
9,000 |
144,000 |
|
Total |
7,450,176 |
| Electric Pipe / Sewerage Pipe / Sanitary Pipe / Sui Gas Pipe |
| 1 |
Electric Pipe |
- |
JOB |
149,014 |
149,014 |
| 2 |
Sanitary Pipe (Hot + Cold Water Lines) |
- |
JOB |
223,521 |
223,521 |
| 3 |
Gas Supply |
- |
JOB |
111,761 |
111,761 |
| 4 |
Sewerage Pipe |
- |
JOB |
372,535 |
372,535 |
| 5 |
Water Tank |
- |
JOB |
18,000 |
18,000 |
|
Total |
874,831 |
| Site Details & Preparations |
| 1 |
Cleaning, Layout, Store, Motor Pump |
1 |
Per Plot |
285,000 |
285,000 |
| 2 |
Double Story House Drawing |
1 |
Drawing |
50,000 |
50,000 |
| 3 |
Plot Size (Length x Width) |
1 |
50x90 |
- |
- |
| 4 |
Plot Area in Sq.Ft |
4500 |
- |
- |
- |
| 5 |
Total Covered Area - Construction in Sq.Ft |
6150 |
- |
- |
- |
| Total Grey Structure Material Cost |
8,660,007 |
| Grey Structure Labor |
| 1 |
Grey Structure Labor Total |
- |
JOB |
2,767,500 |
2,767,500 |
|
Grey Structure Labor Total |
2,767,500 |
| Flooring & Roof Details |
| 1 |
Floor Tile |
571 |
Sq.M |
1,350 |
770,850 |
| 2 |
Tile Laying Labor |
6,150 |
Sft |
50 |
307,500 |
| 3 |
Roof Marble |
2,700 |
Sft |
80 |
216,000 |
| 4 |
Jumbolon Sheet 2 Inch (3x6) |
342 |
Nos |
122 |
41,724 |
| 5 |
Staircase Marble |
- |
JOB |
75,000 |
150,000 |
| 6 |
Stair Railing / Terrace (16 Gauge) |
90 |
Ft |
1,450 |
130,500 |
|
Total |
1,616,574 |
| Bathroom Details |
| 1 |
Bath Wall Tile (7 ft) |
94 |
Sq.M |
1,400 |
131,600 |
| 2 |
Tile Laying Labor |
1,008 |
Sq.Ft |
50 |
50,400 |
| 3 |
Bath Set / Commode / Basin / Mirror / Towel Rod |
- |
JOB |
69,500 |
278,000 |
| 4 |
Plumber Labor |
- |
JOB |
338,250 |
338,250 |
|
Total |
798,250 |
| Kitchen Details |
| 1 |
Wall Tile (4 ft) |
20 |
Sq.M |
1,400 |
28,000 |
| 2 |
Tile Laying Labor |
216 |
Sq.Ft |
50 |
10,800 |
| 3 |
Granite / Marble Countertop |
- |
Job |
1,200 |
102,000 |
| 4 |
Kitchen Cabinet |
2 |
Kitchen |
433,027 |
866,053 |
| 5 |
Stove / Kitchen Hood / Sink Double |
2 |
Kitchen |
51,000 |
102,000 |
|
Total |
1,108,853 |
| Electrical Material Requirement |
| 1 |
Wires / Fans / Exhaust Fan |
- |
Job |
866,053 |
866,053 |
| 2 |
Switches, Sockets, Lights, DB, Back Box etc. |
- |
Job |
259,816 |
259,816 |
| 3 |
Electrician Labor |
- |
JOB |
399,750 |
399,750 |
|
Total |
1,525,619 |
| Woodwork Details |
| 1 |
House Main Door (Solid) / Rooms / Bath / Kitchen |
- |
Job |
1,600 |
404,800 |
| 2 |
Windows etc / Safety Grills |
296 |
Sq.Ft |
1,600 |
473,600 |
| 3 |
Safety Grills |
296 |
Sq.Ft |
300 |
88,800 |
|
Total |
967,200 |
| Room Ceilings & Paint Work |
| 1 |
Room Ceilings |
6,150 |
Sq.Ft |
100 |
615,000 |
| 2 |
Paint Work / Rockwall etc. |
25,335 |
Sq.Ft |
52 |
1,317,420 |
|
Total |
1,932,420 |
| Final Totals (Grey Structure + Finishing) |
| Grey Structure + Labor Total Costs |
11,427,507 |
| Finishing Material Total Costs |
7,948,916 |
| Finishing + Grey Structure Total Cost (Material + Labor) |
19,376,423 |